Switchgear Upgradation
Upgradation of aging LT/HT switchgear with modern breakers, protection relays, and safer panel arrangements to improve reliability and maintenance access.
The phased outage plan minimized production loss while delivering safer, standards-compliant switchgear ready for future load growth.

Scope Of Work
Audit, engineering design, panel replacement/upgradation, protection setting, and commissioning with minimal downtime.
Switchgear Audit
Condition assessment of existing breakers, busbars, and protection schemes.
Panel Upgradation
Replacement/retrofit of switchgear with modern protection and interlocking.
Protection Commissioning
Relay setting, primary/secondary injection tests, and safety documentation.
