APFC Panel Setup
Design, supply, and commissioning of an Automatic Power Factor Correction panel to eliminate utility penalties and reduce reactive power draw.
Post installation, the facility maintained power factor near unity, cleared TANGEDCO penalty exposure, and improved electrical efficiency across inductive loads.

Scope Of Work
Load study, APFC panel design, capacitor bank selection, installation, and fine-tuning during live plant conditions.
Load & PF Study
Measurement of load profile and existing power factor across operating shifts.
APFC Panel Commissioning
Installation of microprocessor-based APFC relay and stepped capacitor banks.
Penalty Elimination
Verification of improved PF and confirmation of penalty-free billing performance.
