Product Detail

APFC Panel Setup

Design, supply, and commissioning of an Automatic Power Factor Correction panel to eliminate utility penalties and reduce reactive power draw.

Post installation, the facility maintained power factor near unity, cleared TANGEDCO penalty exposure, and improved electrical efficiency across inductive loads.

CLIENT Textile Spinning Mill
LOCATION Coimbatore, Tamil Nadu
CATEGORY Power Factor
TYPE Industrial Electrical Project
APFC Panel Setup

Scope Of Work

Load study, APFC panel design, capacitor bank selection, installation, and fine-tuning during live plant conditions.

Load & PF Study

Measurement of load profile and existing power factor across operating shifts.

APFC Panel Commissioning

Installation of microprocessor-based APFC relay and stepped capacitor banks.

Penalty Elimination

Verification of improved PF and confirmation of penalty-free billing performance.